Hydropower Pipeline

West Virginia: Hydropower Pipeline

1,410,000
Conventional Hydropower in MWh
75,626,000
Total Electricity in MWh
4,294,000
Total Renewable Energy in MWh
2%
Hydro as a % of the Total Energy
33%
Hydro as a % of the Renewable Energy
15
Total Powered Dams
NEW CUMBERLAND LOCKS & DAM

Permittee: FFP PROJECT 121 LLC

Type of Permit: Conventional Permit

Authorized Capacity (MW): 49.8

Waterway: OHIO RIVER

SUTTON

Permittee: JAMES R. ROBERTSON

Type of Permit: Conventional Permit

Authorized Capacity (MW): 9.2

Waterway: ELK RIVER

R.D.BAILEY

Permittee: "ENERGY RESOURCES USA, INC"

Type of Permit: Conventional Permit

Authorized Capacity (MW): 10

Waterway: GUYANDOTTE RIVER