Hydropower Pipeline

Kentucky: Hydropower Pipeline

3,450,000
Conventional Hydropower in MWh
80,345,000
Total Electricity in MWh
4,962,000
Total Renewable Energy in MWh
4%
Hydro as a % of the Total Energy
70%
Hydro as a % of the Renewable Energy
12
Total Powered Dams
CAVE RUN DAM

Permittee: "CAVE RUN ENERGY, LLC"

Type of Permit: Conventional Permit

Authorized Capacity (MW): 6

Waterway: LICKING RIVER

GREEN RIVER L & D NO. 5

Permittee: "ENERGY RESOURCES USA, INC"

Type of Permit: Conventional Permit

Authorized Capacity (MW): 7

Waterway: GREEN RIVER

GREEN RIVER L & D NO. 3

Permittee: "ENERGY RESOURCES USA, INC"

Type of Permit: Conventional Permit

Authorized Capacity (MW): 10

Waterway: GREEN RIVER

NOLIN LAKE DAM

Permittee: "ENERGY RESOURCES USA, INC"

Type of Permit: Conventional Permit

Authorized Capacity (MW): 7

Waterway: NOLIN RIVER

ROUGH RIVER LAKE

Permittee: "ENERGY RESOURCES USA, INC"

Type of Permit: Conventional Permit

Authorized Capacity (MW): 10

Waterway: ROUGH RIVER

TAYLORSVILLE LAKE DAM

Permittee: "ENERGY RESOURCES USA, INC"

Type of Permit: Conventional Permit

Authorized Capacity (MW): 3

Waterway: SALT RIVER

KENTUCKY RIVER L&D # 10

Permittee: "ENERGY RESOURCES USA, INC"

Type of Permit: Conventional Permit

Authorized Capacity (MW): 9

Waterway: KENTUCKY RIVER

KENTUCKY RIVER L&D # 8

Permittee: "ENERGY RESOURCES USA, INC"

Type of Permit: Conventional Permit

Authorized Capacity (MW): 11

Waterway: KENTUCKY RIVER

EVELYN HYDROELECTRIC STATION

Permittee: LOCK 13 HYDRO PARTNERS

Type of Permit: Conventional Permit

Authorized Capacity (MW): 2.8

Waterway: KENTUCKY RIVER